Groundwater Harnessing Structures
Subsurface dykes have been constructed to harness Ground Water. The retaining walls erected for the purpose to enable impounding of surface water and in turn became Artificial Recharge Sites, seven Subsurface in different valleys have been completed. The Programme is sponsored by Central Ground Water Board. Two more projects are in the pipe line tro increase in Water Table in the Bore Wells near these structures.
Five check dams constructed by CGWB. During 2018 One additional check dam, One boulder check and eight recharge pits added, courtesy UTC aerospace.